JC Controls Home Page

Home Page

LN2 Catalog
JC Controls 
P.O. Box 607, Orinda, CA 94563  
(925) 939-8877 | fax: (925) 939-8883 


Calibration Instructions

for JC Controls, LN2 Level Controllers


Calibration procedures are simple and require only a DC volt meter with a range of 0 to 100VDC, and a small slotted screwdriver. Depending on the model of controller there will be from one or two sensors that will need to be calibrated.

  <>
Depending on which unit you have you will need a PC Board Layout diagram. Pick one of the units below.

             

1)     Place all of the sensors into LN2 and turn on the PC board ( complete units set power switch to Auto ).

2)     Set your DC volt meter to a scale of 0 to 100VDC or greater.  Find the  diagram that matches your board. Connect the (-) lead of your meter to point (A), then connect the (+) lead to point marked (B).

3)     Adjust Potentiometer B until the voltage is 67 VDC. 

4)     For boards with more than one sensor, repeat steps 3 & 4 for points (C) & (D) if applicable. Keep (-) lead on point (A).

5)     Use the edge connector for alternative test points. (-) is pin 6, (+) pin 12 for B and pin11 for C.


Copyright © 2000 JC Controls